BHEL HARIDWAR SUMMER TRAINING REPORT BLOCK 3 PDF

Summer Training Presentation of BHEL Block Limited Ranipur, Haridwar ( Uttrakhand) Submitted To: Mr. XYZ Submitted By: ABC Roll No. Who give me lot of inspiration and skills to complete this Report successfully. Training Report on Manufacturing of Turbo Generator at BHEL Haridwar .. BLOCK-2 Fabrication (Steam, Hydro & gas Turbine) iii. .. 34 CONCLUSION We have undertaken summer training in Bharat Heavy Electricals Limited, Haridwar. View Test Prep – from MECHANICAL I thankfully acknowledge the staff of BHEL, Haridwar for giving me so much co- (Sr. Manager,TUM Block-3) to support me during my Industrial Training. . I cannot even describe how much Course Hero helped me this summer.

Author: Kagalrajas Gam
Country: Australia
Language: English (Spanish)
Genre: Music
Published (Last): 7 March 2005
Pages: 136
PDF File Size: 7.73 Mb
ePub File Size: 2.33 Mb
ISBN: 802-8-48215-845-1
Downloads: 47504
Price: Free* [*Free Regsitration Required]
Uploader: Faujin

At the same time, a snap ring is provided against axial displacement of retaining ring. Two individual conductors placed-one over the other are bent to obtain half turns. Stator houses the armature winding. Most modern micalastic insulation plant for stator bars.

When the rotor rotates, the lines of magnetic flux cut through the winding. The Company is a major producer of large-size thruster devices. The main features of core are — i.

Gas turbine have been used for electricity generation. To ensure that strands are firmly bonded together and give dimensionally stability in slot portion, a layer of glass tape is wrapped over the complete stack.

  ELECTROPHYSIOLOGIE CARDIAQUE COURS PDF

Bhel Haridwar training ppt

Electrics for Urban Transportation System 1. Several half overlapped continuous layer of resin poor mica tape are applied over the bars. The enthalpy of the steam decreases. The rear end of above exciter armature is mounted with a permanent magnet generator rotor.

Power Semiconductor Devices x. To avoid-heating of press ring due sum,er end leakage flow two rings made of copper sheet are used on flux shield.

Bhel Haridwar training ppt

Continuous circulation of gas inside the machine through a drier in order to remove any water vapor that may be present in it 5. L-shaped strip of laminated epoxy glass fiber with nomex filter are used for slot insulation. Vacuum pressed impregnated mica elastic high voltage insulation: Each retaining rings with its shrink fitted. Rotor inside the stator at standstill.

Training Report on Manufacturing of Turbo Generator at BHEL Haridwar | Hitesh Gupta –

Steamless steel tubes, Sriral finwelded tubes. We have for RC bock and diode circuit. National oil well U. The end stator is packets and core clamping and harridwar intensively cooled by through special ventilation system.

The volume of the steam increases. The blades of fan have threaded roots for screwed into the rotor shaft.

BHEL as a part of Pt. The press ring is bolted to the ends of core bars. BHEL is one of the largest power plant equipment manufacturing firms in India and it ranks among the top ten manufacturers globally.

  COURS DE MICROCONTROLEUR PIC 16F84 PDF

Modernization and rehabilitation of power stations.

INDUSTRIAL TRAINING AT BHEL, HARIDWAR

In the yearit was ranked ninth most innovative company in the world by US business magazine Forbes. The principle of the impulse steam turbine consists of a casing containing stationary steam nozzles and a rotor with moving or rotating buckets. The company has been earning eummer continuously since and paying dividends since The company is a major producer of large-size thyristor devices.

Hydrogen is contained within frame and circulated by fans mounted at either end of summfr.

In the case of a steam turbine, the pressure and flow of newly condensed steam rapidly turns the rotor. Stator winding is done by placing stator on rotating installation. Diesel Generating Sets v. This procedure is for high voltage yaridwar on stator winding of turbo generator. The core business of HEEP includes design and manufacture of large size steam and gas turbines, turbo generators, heat exchangers, condensers and auxiliaries.

The high mechanical stress resulting from the centrifugal summerr and short circuit, torque called for a high specified mechanical and magnetic properties as well as homogenous forging. The rotor is designed for radial ventilation by stem.