Appendix A – M24 Fluokit Disposal Procedures. Fluokit Indoor Ring Main Units contain Sulphur Hexafluoride (SF6) gas as an insulating medium which is. AIR INSULATED SWITCHGEAR. FLUOKIT M+ MV modular switchgear up to 24kV. Technical Specifications. AREVA T&D. Summary. Cubicle equipment. FLUOKIT M+ cubicles include the following features: Operating Cubicles in the FLUOKIT M+ range all have functional . Fluokit M24 & M24+ meets your.

Author: Kazirr Dara
Country: Somalia
Language: English (Spanish)
Genre: Relationship
Published (Last): 8 January 2009
Pages: 195
PDF File Size: 9.41 Mb
ePub File Size: 14.62 Mb
ISBN: 177-4-56357-979-9
Downloads: 29462
Price: Free* [*Free Regsitration Required]
Uploader: Gozilkree

The room must be equipped with standardised high level and low level ventilation. Contacts Group Schneider Electric service centers are there for: No ducts of any kind must pass through the substation’s immediate environment without special protection sheaths or ducts. The safety alert symbol shall not be used with this signal word. M12x30 hook bolt 8. Schneider Electric declines any responsibility for the following points: Examples of the installation of Functional Units with internal arc deflectors.

The height of the top coat must arrive between 0 and 2mm below the fluokih of the irons.

Fluokit M24+ – Schneider Electric |

Access to the substation. Cable troughs and ducts must be blocked up to avoid: Schneider Electric, the Schneider Electric logo and their ,24 forms are Schneider Electric registered trademarks.

These are carried out by Schneider Electric or by a specialised technician, trained by Schneider Electric in the implementation of procedures, and who is 2m4 with specific equipment. Pouring the cement top coat On the un-surfaced exposed concrete, pour a top coat of smooth finish, without ballast.

Symbols of information 06 Code for a product recommended and marketed by Schneider Electric 21 Nm Tightening torque value Example: Altitude of the connecting points in relation to the cable flanges other than mounting base.

Make up a frame composed of two profile sections, laid out, one at the rear and one at the front, in the lengthwise direction of the switchboard. Compliance with this indication is compulsory, non compliance with this stipulation may damage the equipment.

  INTERCLUB AGREEMENT 1996 PDF

This document has been printed on ecological paper Publishing: Layout of the Functional Units. Benefits Economical compact design for space saving Operator safety maximum Internal Arc Containment up to 25 kA, 1s, exceptional, interlocking mechanism Easy installation and operation, CB “withdrawable” in option, clear outline, earthing switch position easily checked Easy to upgrade as large choice of functions available for any application in distribution Environmentally friendly and fully recyclable Continuity of service LSC2A.

It can be used in a wide range of application fields such as utilities, wind parks, industry, buildings, infrastructure and consumer substations. The durations for completing the operations mentioned given in the maintenance tables are purely an indication and depend on on-site conditions.

Schneider Electric, the Schneider Electric logo and their figurative forms are Schneider Electric registered trademarks. Apparatus efficiency and apparatus life depend on the compliance with the installation, commissioning and operation instructions described in this user manual.

Levelling the profile sections. Local safety requirements which are in accordance with these instructions, especially those regarding the safety of product operators and other site workers, must be observed.

The delimitation of the civil engineering dluokit depends on the type and quantity of materials to be installed refer to the following chapters. The irons also serve in levelling the cement topcoat.

Preparation of the sections Two profile sections must be laid out, one at the rear and one at the front, in the lengthwise direction of the switchboard. These openings are to be calculated and carried out at the same time as the installation of the equipment to the floor. Substation installation requirements The substation must be sheltered from flooding and any infiltrations. Layout on a type 2 cable trough, with width of more than 50cm.

Fluokit M24+ – Schneider Electric

Access to the substation Substation access must remain free at all times and under any circumstances. Its thickness must be about 40mm of cement dosed at kg of CPA. Except when it is imposed, the wearing of the gloves has been voluntarily limited in this manual so as to have clear visuals of the hands and operations described.

  KISI RESIPROK PDF

Definition of the substations. Painted sheet steel 2 mm thick.

Installation of the frame. All manipulations must be completed once started.

FLUOKIT M24+ – Schneider Electric

Certain passages must be sufficient for free movement and execution of operation and maintenance manoeuvres, – leave the room’s access door free, – take all measures to prevent all incidence of climatic conditions humidity, pollution, etc. Do not do it! Reserve opening at the extremity of each rail. The average water vapour pressure over a period of 24 hours must not fluokut 22 mbar.

Secondary Air Insulated Switchgear. Preparation of the frame in profile sections. The dressing of a top coat of cement using a rule should eliminate any surface irregularities greater than 2 mm per metre. Geometry of the cable trough. Schneider Electric request the carefully reading of the following instructions in order to familiarize yourself with the product in this document before trying to install, operation, put into service or conduct the maintenance on it.

They are routed along a cable trough or trench or through floor openings. The interventions described are carried out on de-energized equipment in the course of being installed or locked out non operational. The interventions described are carried out on de-energized equipment in the course of being installed or locked out non operational. Browse services Field Services Optimize the life cycle of your assets, improve performance, safety, and reduce maintenance costs — all with an experienced provider of complete field services and a partner you can trust.

U section 32x20x2 2. It offers optimum fuokit flexible switchboard configuration for every electrical scheme with the highest safety. For these specific cases, flukoit the Schneider Electric Sales Department.

Position and adjust the rails in height by acting on the adjusting nuts. Nevertheless, if the room’s architecture does not permit this type of installation, other options exist in order to meet the requirements of Standard IEC FLR rear access, internal arcing etc.